The earthmovers are here!
The top soil has been moved into large piles:
They're digging out the retention basin (it's huge!):
And are grading the area (below, to the left is where the actual building will be). The crushed stone driveway (temporary) is to prevent dirt and mud from being tracked onto Liebig Avenue.
The top soil has been moved into large piles:
They're digging out the retention basin (it's huge!):
And are grading the area (below, to the left is where the actual building will be). The crushed stone driveway (temporary) is to prevent dirt and mud from being tracked onto Liebig Avenue.