Elevator work, electrical begins, geothermal drilled
07/26/08
The elevator shaft is boxed in.
Upstairs:
and downstairs:
The electrical wiring begins.
It is done with metal-shielded product that minimizes the risk and damage in case of fire.
We have some more new signs out front, -
Ductwork
07/18/08
Sanctuary ceiling before the ductwork began:
Ductwork delivered and piled waiting for installation:
First the duct outflows are installed:
Then the ductwork with insulating wrappers are put into the ceiling:
-
Green roofing
07/12/08
The roof is undergoing a transformation from lumber, to tarpaper, to eco-friendly slate-look tiles!
Chris Holaday and his able team apply the fancy-schmancy eco-friendly roof tiles.
Designed to mimic slate, they are actually made of recycled
-
Elevator work, electrical begins, geothermal drilled